Our realizations
Construction of a transfer center at the new Oława Zachodnia railway stop
Construction of a transfer center at the new Oława Zachodnia railway stop
Contract value 16.85 million
Implementation date: Q1 2025-Q4 2025
As part of the construction of the transfer center, it is planned to build a Park&Ride type parking lot
with parking spaces:
• for passenger cars;
• for passenger cars used by disabled people,
marked in blue and with an appropriate pictogram;
• for cars equipped with a lift at the rear of the vehicle to transport people
moving in wheelchairs, marked in blue and with an appropriate
pictogram;
• for motorcycles;
The project also provides for the construction of Kiss&Ride type spaces.
Rainwater and meltwater will be drained into the planned storm sewer system,
retention ditch and drainage ditch to the existing storm sewer system. It is also planned to
install lighting and a technological channel.
In addition, it is planned to create a pedestrian and bicycle path, which will
connect Paderewskiego Street with the car park.
Within the Park&Ride car park, it is planned to create 6 bicycle shelters
for 104 parking spaces and an additional 22 uncovered spaces within the Bike&Ride car park.
The designed communication system is coordinated with an underground passage
and ground access to the new railway platforms, which are designed according to a separate
study entitled: "Construction of a new Oława Zachodnia stop" as part of the "Governmental program
for the construction or modernization of railway stops for the years 2021-2025" implemented
by PKP PLK S.A. ZLK in Wrocław.
The investment also includes the construction of a bus terminus and a double
bus stop with a platform, where bus shelters, benches and waste bins are planned to be located.
In the entire parking lot and access road, it is planned to install small-scale
architecture objects, lawns and plantings of tall and short greenery.